MineralCrete™ impact estimator

What could MineralCrete mean for your plant?

Set your replacement level and your annual volume. Every number below updates from validated laboratory results.

Your mix
Application
Cement replacement
25%
10% 15% 20% 25% 30% custom
Annual volume
Cement content
28-day target
Units
Assumptions: cement $160/ton · 0.92 t CO₂/t cement
How we get these numbers

Results are the closest validated MineralCrete mix to yours, shown as tested ranges. Strength assumes standard admixture adjustment. Not a guarantee. Confirm with a sample in your own lab.

Cement replaced per year
3,125 tons
About 125 tanker deliveries you do not take
CO₂ avoided per year
1,760 t CO₂
Equal to 380 cars off the road
Cement cost displaced per year
$500k
Net pricing discussed on request
90%
lower chloride penetration
ASTM class jumps from Moderate to Very Low, in every mix tested.
Tested at 25 – 30%
97%
less ASR expansion
Keep the reactive aggregate you have and pass the test.
Tested at 25 – 30%
51%
less drying shrinkage
Fewer cracks, tighter tolerances at 56 days.
Tested at 25%
+26%
early strength at 7 days
Faster turnaround on forms and beds.
At your 25% level
+16%
28-day strength, matched or exceeded
Your specification holds with a quarter less cement.
At your 25% level
+20%
flexural strength
More bending capacity in the same section.
Tested at 25%
Strength versus age, scaled to your 5,000 psi target
MineralCrete range Your control Target
With standard admixture adjustment. Precast-validated; ready-mix trials available on request.
See it in your own lab.
We send material. You mix it your way and crush it on your machine.